Leichardt Job

Finished Product

Well, for a change for us we manufactured timber windows and doors, then the boss drove up to NSW with them, whilst myself (production manager) and our main installer flew across.

we spend the Easter break installing 3 hinged doors, a sliding door, new sashes for front existing windows, 2 new spiral balance hung lift up windows, an awning window, a large fixed lite window and a sliding window.

a mixture of double glazed glass and comfort plus low-E.

we had primed the windows/doors prior to heading to NSW. the raw timber had to be done on site.

It was quite hard to get any good photos, due to the closeness of fences and trees etc.

Leave a comment