Month: September 2016
Office partitons
Work in progressSpent a few days installing office partitions, doors, glass and locks on various floors of a franklin st building in adelaide’s CBD. we re-used some glass panels, and some doors, with the rest being manufactured in our factory and then installed on site.
a WIP photo.
Very hard work with most items requiring transport up staircases.or lifts.
Matchboard Raked Gate
Finished ProductWe had been asked to remake a rotten gate which was raked (so it could be opened on a slanted hillside driveway).
A lot of time and effort to make these beautiful gates, and everyone is very pleased with the result.