How fast this year has flown by. As deadline to our one and only break looms, we are pushing as much work out as possible. Some random work of what has been going on;







How fast this year has flown by. As deadline to our one and only break looms, we are pushing as much work out as possible. Some random work of what has been going on;
We had a client order 10 windows, a sliding door and a hinged doorframe to be picked up and then sent to Wudina. Today we had them all wrapped up ready for pick up tomorrow. Cottage green, and mostly all 6.38 laminate glass.
Today I have done a bit of everything; helping the lads out on all these odd jobs for the start of the year. Always with a camera in hand, here is some of the things we are doing today.
Here we are making a large arched window with colonial bars, top down photo showing us setting up the template etc.
Glazing some sashes with colonial bars…. all in cedar.
Here is mill (raw) alumimium commercial frame we have engineered to a curve. we will then make a window from it.
We make so many of these or variations of, that i rarely take photos of them.
This is a residential aluminium window, powdercoat black with white translucent glass.
it has a horizontal sliding section up top and a fixed lite below.