Arches; timber and aluminium + glazing some sashes.

Work in progress

Today I have done a bit of everything; helping the lads out on all these odd jobs for the start of the year. Always with a camera in hand, here is some of the things we are doing today.

 

Here we are making a large arched window with colonial bars, top down photo showing us setting up the template etc.

Here we are making a large arched window with colonial bars, top down photo showing us setting up the template etc.

Glazing some sashes with colonial bars.... all in cedar.

Glazing some sashes with colonial bars…. all in cedar.

Here is mill (raw) alumimium commercial frame we have engineered to a curve. we will then make a window from it.

Here is mill (raw) alumimium commercial frame we have engineered to a curve. we will then make a window from it.

Paperbark shopfront windows and pivot doors

Work in progress

Here we are installing some commercial fixed frames as well as a doorframe +pair of pivot doors.

All in paperbark, with subsills and laminate glass.

shop front. commercial aluminium fixed lites in paperbark powdercoat

shop front. commercial aluminium fixed lites in paperbark powdercoat

20151211_132900

Commercial framing with hinged door

Work in progress

 

Its nearing the end of the year and we have been flat out trying to get all our work done before the xmas break. Its so busy ive had no time to upload new photos recently, but here is a job we were on yesterday.

Clear Anodise series 400 commercial framing with hinged door.

Clear Anodise series 400 commercial framing with hinged door.

This job now needs to be glazed, and we have windows on the second floor as well.

Mill aluminium ready for powdercoater

Work in progress
Mill (raw) aluminium, ready for delivery to the powdercoater for painting as "NOTRE DAME "

Mill (raw) aluminium, ready for delivery to the powdercoater for painting as “NOTRE DAME “

 

This is what windows and doors look like after being cut, docked, machined from the raw extrusions. next stop the powdercoater to paint them – in this case a colour called NOTRE DAME will be used. then we get the painted extrusions back, check they are ok and then assemble them ready for the next step after that – glazing.

 

Office Partitions

Work in progress

Here is some photos of the office partitions we have set up this morning.  Located in the CBD on a third floor of a building. Glazing will be clear laminate; 6 and 10.38 thickness.  No one is looking forward to lifting the glass up 3 stories.

20150821_092910

Clear Anodise Commertcial aluminium framing. This is for office partitions on a 3rd floor of a building in the adelaide CBD. Ready for glazing.

20150821_093040

Clear Anodise commercial framing with hinged door and stainless steel handle. Egress lock with cylinder on outside. We are making 4 of these frames to make 4 rooms.

Busy day – some photos

Work in progress

Today we had a lot of random things on the go; have some photos.

 

20150820_122213

Large cedar Pivot door being glued up.

20150820_122159

Jarrah doors with colonial bars being assembled.

20150820_141520

Clear anodise commercial frames and doors for an office partition in CBD – ready to be installed first thing tomorrow morning. Each frame is over 3m high and will be installed on the third floor of a building.