Thursday we drove to Edithburg, and worked on 4x windows. stayed overnight and finished it the next day.
window install
Alum to timber install
Uncategorizedthis morning we removed an aluminium garden bay window in a kitchen, and replaced it with a more traditional window that would have originally been there.

This is the aluminium window we were to remove. This is to coincide with a kitchen refit inside. note the roof- that actually opens!

Window removed, and the opening exposed. You can see how much silicon on the sides (and head) were used on the alum window.

New Cedar Window. Quads outside, lining and aves on the inside. new kitchen bench will slide right up against the window sill.
Square Bay Window removal and install
Finished Product, Work in progress
This is the original window. from afar, it looks OK. however it had been bogged up with putty and car bog to fill in some rot in various joins. the glass is 3mm float. A variety of different timbers were in this old frame; pine, cedar, meranti, and a bit of oak.

glass panels are removed, and in this instance we worked by removing the small side first, adding the new window and then removing the longer side.

The Head of the window was nailed to the overhead beam which had been capped in metal. Great care had to be taken at this stage.

New little window has been placed temporary, whilst the head of the larger window frame is now being moved.

New Window frames now placed in. The Client had painted them prior to us installing/glazing. Glass is a much thicker/safer 6.38 laminate glass.

End result. The client just needs to paint the extra timber panels on corner and top and it will blend in. This install was done in 1 day, with a 2nd day to just add an extra piece of timber on the inside to cover the gap between gyprock and window frame.
Office Partitions
Work in progressHere is some photos of the office partitions we have set up this morning. Located in the CBD on a third floor of a building. Glazing will be clear laminate; 6 and 10.38 thickness. No one is looking forward to lifting the glass up 3 stories.

Clear Anodise Commertcial aluminium framing. This is for office partitions on a 3rd floor of a building in the adelaide CBD. Ready for glazing.