
Well, its been a hectic and busy few months for us all. Our timberside is literally filled with frames at the moment, and supply chains seem to lag along. We even had a problem of getting grey laminate glass for a short while…









Regards PG @ TWM.

Well, its been a hectic and busy few months for us all. Our timberside is literally filled with frames at the moment, and supply chains seem to lag along. We even had a problem of getting grey laminate glass for a short while…









Regards PG @ TWM.
Yesterday we removed 2 old aluminium sliding windows (the original timber frames were still hidden behind them and also had to be removed).
We kept the internal linings, nosing and aves as they were in good condition and there was no need to replace them. But more care is required when removing the existing frames so as to not damage those internal timbers.
We replaced them with new cedar single hung windows. Dummy side sashes (they dont move). Locks, screen and operated with spiral balances (black tubes that hold the sash up and down – as opposed to weights and pulleys in a box frame window (we we also make).

Another year is winding down for us at TWM. And what a year it has been for us all.
Just a quick notification we are closing end of today and will (officially) return on the 18th.
If you require a quote, please send us an email with your details (and some photos if you can) and we can get back to you in the new year.
georgethewindowman@gmail.com
Blackbutt or Ironwood is a very dense hardwood. nearly 900kilos a cubic meter its almost 3x heavier than the cedar we usually work with. Here we have made a corner stacker door system + a standard stacker door. We will install tuesday at mt barker.


We are flat out as the year winds down. So much so, i’ve had no time to post our works – even the more interesting ones. So keep in mind #thewindowmanSA on instagram has more photos as it’s quicker for me to do so.
Wed and Thurs we removed 2 corner timber windows which had extensive water rot.
We did one set each day.

before and after

The original window- sorry i dont know why the picture image failed so badly. The Window was rotten and the top sash glass was ready to drop out the base of the sash.
Yesterday we installed 2 windows. 1 is a fixed frame where we reused the old leadlight. Pictures speak louder than words;-

New window in, but yet to cap/finish the surrounds



Just back in the office after this mornings install. Old Casement window had well and truly rotten away. New Cedar Awning window – clear glass, and winder + screen on inside.

I thought i had posted this photo a while ago – its on my instagram page.
new WRC sliding door

WRC sliding door

A dog had chewed the colonial bars of the window. We had been asked by insurance to replace this section of the bay window.

This sash had rotted and no longer was operable. Again we were asked to replace this section of the bay window.

Old sash / New sash!

After a hell of a lot of care to remove the existing center frame from the above timber paneling. Same on inside – we managed to keep all the decorative beading on the inside. New panel in, cover plates replaced.

New awning sash in place too.
Yesterday we removed 3 old aluminium sliding windows which had 3mm float glass, and replaced them with new slightly larger residential framing( depth 60mm) glazed with 6.38 clear laminate glass. Awnings with chain winders and screens. The result was quite dramatic, with a fair few compliments as people passed by.
3 of us on the first day, and1more morning to just finish some angles on the outside.
